Year of design: 2010-14
Designer: Dániel Bianki DLA
useful floor area ~ 500 m2
Status: built in 2015
The project was commissioned after a call for tenders launched by the Methodist Church in late 2009.
The plans were completed by the end of 2010, and the building was the main subject of my doctoral thesis at the Breuer Marcell Doctoral School.
The design was carried out in collaboration with several architectural firms.